Figure 2 outlines a more sophisticated but still relatively simple set-up, in which each tank delivers chlorinated water to the sheds only after a specified holding period, which is predetermined by the time the paired tank takes to empty. The minimum retention period will be determined by the size of the tanks as they relate to water usage on farm under peak demand. This should be around a minimum of two hours for chlorine, but in most existing set-ups extends to 12 or more hours.